Renovation of an existing building occupying Pier 2 within the National Historic District in the GGNRA at Fort Mason; includes demolition, restoration, and replacement of existing features are required, as is new construction. Cowell Theater, located at the north end of the pier will be upgraded as will approaches to the theater; new multi-purpose space is in the process of being designed and built on the second floor at the north end of the Herbst Pavilion.
Architect: Leddy Maytum Stacy Architects
Location: GGNRA, Fort Mason, San Francisco, CA
Square Footage: Approximately 69,000 sq ft